About Us|Blog/News|Careers|For Immediate Assistance Call 937.692.5107
|

GET IN TOUCH
Loading

Brumbaugh Construction Planroom

Return

Alterations 2022 Piqua High School

This project consist of Renovation of the existing building to include: Selective Demo, Abatement, Concrete, Masonry, Structural Steel framing and decking, Aluminum Railings, Rough Carpentry, Casework, Doors and Hardware, Storefront, Walls & Ceilings, Flooring, Painting, Div. 10 specialties, Manufactured Casework, Laboratory Casework, plumbing, HVAC, Electrical.

This project will start May 31, 2022 and be Completed August 19, 2022.

Project is Standard Wages and Tax Exempt.                                                                                                               

2nd and 3rd shift will be required IF necessary. Please list this on Bid Proposal if it is necessary for your particular scope of work.

Thanks,

Jamie Hileman                                                                                                                                                                                                                                                    

To download

Title Last modified time
2022-01-24 Bid Drawings - Full Set.pdf 1/26/2022 5:21:34 PM
2022-01-24 Bid Specs - Full Set.pdf 1/26/2022 5:21:34 PM
2022-02-04 Addendum 01 drawings.pdf 2/4/2022 2:58:18 PM
2022-02-04 Addendum 01 merged 2-7-2022.pdf 2/7/2022 9:29:12 AM
2022-02-09 Addendum 02 - Drawings.pdf 2/10/2022 7:40:59 AM
2022-02-09 Addendum 02 merged.pdf 2/10/2022 7:40:59 AM
2022-02-10 Addendum 03.pdf 2/11/2022 9:01:34 AM
Piqua HS 2022 - HVAC - ADDENDUM 3.pdf 2/11/2022 9:01:34 AM