Ansonia Street Reconstruction
Full road reconstruction of East Canal Street in Ansonia from North Main Street (SR 118) to Fourth Street. Project included 1800 L/F roadway construction including waterline replacement, storm drainage reconstruction and the removal and replacement of all curb and sidewalks. Additional work included storm drainage east of town along with water line installed east of the High School.