Broadway Street Bridge over Wolf Creek

This project replaced a two-span steel girder bridge constructed in 1927, with three spans of pre-stressed concrete I-beams on reinforced concrete wall type abutments and wall type piers. The three bridge spans are: 61’ – 89’ – 61’. Ridge Ave. was realigned between Riverside Dr. and DeWeese Parkway. The roadway is 35’ wide with 10’ sidewalks, an improvement over the 6’ sidewalks on the old structure.

Location

Dayton, OH

Category

Bridges