About Us|Blog/News|Careers|For Immediate Assistance Call 937.692.5107
|

Road-and-Highway-Construction-Services-Dayton-Ohio
GET IN TOUCH
Loading

Village of Minster Fourth St. Reconstruction, Phase I & II

Complete reconstruction of Fourth Street in Minster, OH, from Ohio Street at the west side of town to Garfield St. The job included storm, sanitary, and water infrastructure upgrades along with streetscape improvements, including sidewalks, curbs, pavers, lighting, landscaping with irrigation, traffic signals, and brick roadway paving. The job utilized Silva Cell technology for better root stabilization of the 60 Freeman Maple trees that line the corridor. In all there was about 14,000 lf of pipe, 7,000 lf of curb, 30,000 sf of sidewalk, 25,000 sf of sidewalk pavers, 10,000 sf of roadway paved, 38 decorative street lights, and 4500 cy asphalt.

Location

Minster, OH

Category

Highways

  • Highways
  • Highways2
  • Highways3
  • Highways4
  • Highways5