Return
General Construction: New 5,000 SF bus maintenace garage. Pre-engineered metal building with brick wainscot. High bay for the maintenance of vehicles and a low bay that includes offices, break room, toilet room, and storage. Site Work: Grading and utilities to support the new building. A large fenced in parking area for busses, and fuel station. Plumbing Work: Large trench drains in the high bay area along with a service sink and eye wash. Toilet room in the low bay area. HVAC Work: Radiant heat system in the high bay area. Furnace and condensing unit for the low bay area. Electrical Work: Underground feeder from secondary of utility company pedestal at utility pole base to meter. CO/NO self contained system. Power to fuel island. Alternates included. Technology Work: Technology to the maintenance building and field station.